Commanding the Heat: The Process Heating Company Story

When a massive asphalt plant or a heavy industrial fluid operation requires exact, unrelenting temperature control, relying on archaic fossil-fuel burners or volatile steam units is a catastrophic liability. They degrade, they hemorrhage massive amounts of energy, and their violent, uneven heat actively scorches and destroys the very materials they are meant to sustain. Dictating absolute, flawless thermal energy without compromising the payload requires severe-duty, high-efficiency electric engineering. Commanding this indestructible industrial heat is the undisputed domain of Process Heating Company (PHCo).

They do not just build basic coils. Since 1947, they have operated as the absolute pioneers of thermal stability, engineering the highly advanced electric immersion heaters that heavy industry relies on to keep their massive operations flowing safely and continuously.

Forged by the Thermal Pioneers

The PHCo legacy was born from a fundamental refusal to accept the dangerous, inefficient bottlenecks of the 1940s. In 1947, Ed Jay and Rudy Hentz went to work to completely revolutionize how the heavy asphalt sector controlled its environment.

They intimately understood that standard heating systems were an operational nightmare—prone to failure, environmentally toxic, and highly destructive to liquid payloads. By engineering the absolute first consistent, electric, low watt-density resistance heat source, they permanently altered industrial thermal management. Their patented innovation completely eradicated the violent spikes of open-flame burners, laying the unyielding foundation for decades of thermal dominance.

The Arsenal of Thermal Command

To guarantee absolute operational supremacy, Process Heating Company deploys a highly specialized arsenal of thermal technology, engineered to outlast the facility itself:

 Lo-Density® Supremacy: Engineering the patented, drywell-style immersion heaters that dissipate heat evenly over massive surface areas while keeping the sheath’s temperature incredibly low. This guarantees that highly sensitive payloads—like heavy asphalt, complex emulsions, and industrial fluids—never scorch, maintaining absolute product integrity.

 Uncompromising Efficiency: While traditional fossil-fuel burners violently bleed energy, dropping to a dismal 50% to 65% efficiency over time, PHCo’s electric iron converts raw power into heat with an unyielding, guaranteed 100% energy efficiency for its entire lifespan.

 Zero-Downtime Maintenance: Raw heat is a liability if it forces a shutdown. PHCo’s drywell-style elements completely eradicate the need to drain massive, multi-ton tanks for service. With no burners, no open flame, and absolutely zero emissions or permit requirements, the system is engineered to be set and forgotten.

 The Ironclad Standard: PHCo refuses to build disposable technology. Their heavy-duty heaters are relentlessly durable, often providing 100% efficient heat for 30 years or more. To prove absolute confidence in their engineering, they back their heating elements with an undisputed, industry-exclusive 5-year warranty.

By seamlessly fusing over 75 years of pioneering electrical engineering with an uncompromising drive for extreme reliability, Process Heating Company ensures that when the massive tanks need heat, the temperature holds, the material survives, and the plant never runs cold.

 

Year Founded: 1947

Main Products: Heating Tanks, Asphalt

Brand: PHC

Country of Origin: USA

Facebook Account: N/A

Website: https://www.processheating.com/

Address: 2732 3rd Ave S, Seattle, WA 98134, United States

Contact No.: +12066823414

Email: https://www.processheating.com/contact-us/